Sizing and installation

We work out the oxygen demand from your figures, pick the unit and install it with anchored mooring cables, without emptying the tank. Enquire from this page: it takes about a minute.

Enquire

Last updated

What does sizing and installation include?

Every job starts with the tank or basin: its area, depth, level range, the load going in and what the discharge licence asks for, which you send us with your enquiry. From that we size the aerators on oxygen demand and on mixing, and we show you the working.

Floating units go in without emptying the tank. Each one is held by three or four cables to the walls or to anchors so it can rise and fall with the level, and the power cable is floated and strain relieved.

What do we need to size an aerator?

  • The tank or basin area, depth and how much the level changes
  • What flows in, and the limits in your discharge licence
  • The power supply on site
  • Where units can be anchored and how the site is reached

Frequently asked questions

How do I ask about sizing and installation?

Use the Enquire button on this page, or add it to your enquiry list with other devices. You can also email [email protected].

Ask about sizing and installation

We use your details only to reply. No cookies, no mailing list.

Other services: see them all.

Send an enquiryCall