Application

Aeration for food and dairy effluent

Short answer

Food processing and dairy effluent carries a high organic load that changes with production. Floating aerators add oxygen to effluent tanks and balancing tanks, keep solids moving and help control odour, and more units can be added for seasonal peaks.

Last updated

Why does food and dairy effluent need aeration?

Milk, whey, wash water and process residues are rich in organic matter. Without enough oxygen a tank turns septic, which raises odour and makes it harder to meet discharge limits.

Why does odour matter so much for food and drink sites?

The EPA reported that the food and drink sector accounted for 51 percent of the 1,181 public complaints it received in 2025, mostly about odour and noise, and that the sector features prominently on its National Priority Sites list. An effluent tank that goes septic is a common source of that odour.

Source: EPA news release, 25 March 2026, on compliance at licensed sites in 2025 (epa.ie).

What helps with changing production loads?

  • Floating units that follow the tank level
  • Extra units for seasonal peaks
  • Aerator mixers where mixing matters as much as oxygen
  • Low spray units near roads and neighbours

What should I send with an enquiry?

  • Tank size and depth
  • Daily flow and, if known, BOD or COD
  • When production peaks
  • Your licence limits

Sized for your tank

Send the tank size, depth and what flows in. We reply with questions or a written proposal.

Send an enquiry

Frequently asked questions

Do aerators help with effluent odour?

Keeping a tank aerobic is the main way to avoid the septic conditions that cause odour, and surface aerators also strip dissolved gases such as hydrogen sulfide.

Send an enquiry

New units, supplied and installed across Ireland. Sold by enquiry.

  1. Tell us about the tankSize, depth, what flows in and what your licence asks for. A rough figure is enough to start.
  2. Sizing and proposalA written proposal with unit sizes, the working behind them and the running cost.
  3. Supply and installUnits go into the working tank on anchored moorings. No emptying, no concrete works.
  4. Handover and warrantyWe commission the units with you and hand over the manufacturer warranty and documents.

Or call 087 473 6464 or email [email protected]

We use your details only to reply. No cookies, no mailing list.

Send an enquiryCall